Building
This department regulates buildings to ensure public health, safety, and welfare through structural integrity, fire safety, sanitation, and ventilation.
This department only serves those within the unincorporated areas of Utah County. If your property is in a city please refer to the city's specified codes, services, and/or website.
ATTENTION This department only serves those within the unincorporated areas of Utah County. If your property is in a city please refer to the city's specified codes, services, and/or website.
Building Permit
When a building permit is required
Before commencing any building or construction work, changing the use of a building or its portions, or performing work on electrical, gas, mechanical, or plumbing systems regulated by the adopted codes, owners or their authorized agents must apply for and obtain a building permit. Some exemptions may apply—please contact the Building Official for details (stevek@utahcounty.gov)
Submittal Requirements
Below are the submittal requirements for various types of building permits. Please select the appropriate link for detailed information on each category:
- Single Family - Submittal Requirements
- Garage, Carport, or Similar - Submittal Requirements
- Commercial, Industrial or Similar - Submittal Requirements
- Residential Solar Plan - Submittal Checklist
Application Process
Submit:
Review:
Finalize:
Governing Codes, Regulations, & Design Criteria
State Construction Code (Utah Code Title 15A & Amendments)
International Building Code 2024
International Residential Code 2021
National Electrical Code 2023
International Plumbing Code 2024
International Mechanical Code 2024
International Energy Conservation Code 2024
International Fuel Gas Code 2024
International Existing Building Code 2024
ANSI Standard 117.1A
Frost Depth........30" or engineer's design if deeper
Seismic Zone........IBC Section 1613
Wind Load in MPH........IBC Section 1609
Snow Load (Site specified based on the adopted snow load study & State Amendments, see link below)
Inspection Scheduling
Request inspections when the work is ready and before it is concealed. To prepare, refer to the required inspections list provided with your permit.
When scheduling an inspection, have your permit number, inspection type, project location, and contact information ready. Please provide up to 3 days' advance notice for inspection requests and plan accordingly.
Contact us for inquiries or inspection scheduling:

Forms
Access Permit Form
Access Permit Form for a plan of planned improvements.
Building Permit Application (All Projects)
Application for building permit. This application is required for permission to build.
Owner Builder Certification & Agreement to Comply with CTLA
For new residential construction or remodel construction.